Commercial Projects

Commercial Projects

Splash Universe Water Park Resorts Holiday Inn Express

Dundee, MI
When Tornados struck Dundee, Michigan one early spring morning, Burton Brothers was called in to access damage and perform temporary repairs. Our rapid response team was called in. They quickly established temporary power allowing for roof framing and temporary roof cover. Immediate, dangerous situations were addressed for safety concerns and to prevent further damage from all areas. Plans for clean up of all debris from outside common areas, pool area, and parking lots devised and completed within 48 hours. Interior environmental concerns were addressed with the rapid drying process that mitigated bacteria, and mold.

Nestle Corporation (Arrowhead Springs)

Ontario, California
Water pipeline damaged by wild fires and mudslides. Spring water tapped from the top of a mountain and piped down through steel tubes became damaged. Eight miles of steel piping, spring houses, antennas and solar panels were inspected and deemed for replacement or repair. Helicopters hired for difficult delivery of replacement components, tools, workers, and finally re inspection of the pipeline before reactivation of water surge.

Hickory Grove Condominiums

Bloomfield HIlls, Michigan
Fire damaged 3 units of this upscale condominium. ***Quick response from our 24 hour emergency board up service allowed heat to be restored and which minimized the damage in the dead of winter. Full restoration was then performed upgrading to the latest building codes for management and updating designs to the delight of the homeowner.

Pacific States Cast Pipe

Provo, UT
Explosion * Cost Analysis, Estimating and Scheduling

University of Michigan

Ann Arbor, Michigan
Yost Arena * Wall collapse in the University of Michigan Yost Ice Arena. Burton Brothers provided scope and pricing to the University.

Point West Condominiums

Galveston, TX
Hurricane Damage on this condominium in Galveston Texas brought water and wind damage. Burton Brothers on the job cost analysis and estimating allowed workers to begin repairs before mold infestation occurred, which is so important in preventing further damage and keeping costs down. $26,000,000 Project

Houston Community College

Houston, TX
Hurricane Damage Burton Brothers consulting division provided cost analysis and estimating. $6,500,000 Project

Sheraton Brook Hollow

Houston, TX
Hurricane Damage to this large hotel halted business and vacations as well. Burton Brothers Nationally Recognized Consulting Division's immediate response with cost analysis and estimating allowed the restoration to be addressed before mold and environmental damage occurred. $5,500,000 Project

Grand Blanc Processing Plant

Grand Blanc, Michigan, Genesee County
Chemical Explosion at Grand Blanc Procession Plant. Burton Brothers estimated the damages, and coordinated repairs which included cleaning of all machinery, replacement of electrical feeders, repaired mechanically fastened roof, cleaned and painted concrete walls. Partial production for the plant was made available during reconstruction providing full capacity in just three weeks. $1,500,000 Project

Payne-Pulliam Career Center

Wayne County, Detroit, Michigan
Vandalism stopped operations offered by this non-profit career center which provides programs for Work First, PAL, and WIA. Burton Brothers General Contractors 24 hour board up service came out and provided safety to the remaining elements. Then restored the building to fully operational capacity. $18,000 Project

Detroit Transportation Corporation * People Mover

Detroit, MI
Detroit People Mover * Maintenance Repairs which includes but not limited to replacement of grating at all train stations with professional metal ground level grating allowing for the safety of every people mover passenger.

Kowalski Sausage

Hamtramck, MI
Fire Damage * Restoration $500,000 Project

Dillard University

New Orleans, LA
Code Compliance $60,000,000 Project

May Company

Los Angeles, California
Earthquake Damage* Scope, Cost and Scheduling $10,000,000 Project

Port Authority of New York

New York, New York
Path Tunnel Restoration 9/11/01 * Terrorist Attack***Burton Brothers General Contractors was called to serve as lead consultant for properties controlled by the New York Port Authority. Subway Tunnels were just one of our assessment of damaged properties. Our countries vulnerability that day proved to Burton Brothers that we must take steps in all our lives to serve and protect and watch out for each other. Scope and Cost $160,000,000

Fox and Hounds Restaurant

Bloomfield HIlls, Mi
Fire completely destroyed this landmark restaurant in Bloomfield HIlls. Burton Brothers rebuilt in record time allowing business interruption kept to a minimum. As with all Burton Brothers rebuild projects, building code compliance is strictly adhered to. The restaurant was back preparing their delicious meals in their beautifully remodeled kitchen and dining room in record time. $3,000,000 Project

Ground Zero

New York, New York
September 11, 2001 changed everyone's life. Burton Brothers is proud to have provided professional assistance in the assessment of damage of the Millennium Hotel, Merrill Lynch and Dow Jones Buildings. Burton Brothers also served as the lead consultant for properties controlled by the New York Port Authority. Working at round Zero as well as the underground retail, parking, and subway tunnels provided a grim reminder of our vulnerability but also made us proud to assist in rebuilding a symbol of our freedom.

Chrysler Corporation

New Castle, IN
Fire Damages * Budget and Scheduling $3,000,000 Project

General Motors Corporation-Pontiac Motors

Pontiac, MI
Fire Damage * Estimate and Scheduling $2,000,000 Project

Miami International Airport

Miami, FL
Tornado Damage* Code Review $2,000,000 Project

Dillard University

Austin, Texas
Water Damage * Estimating and Consulting Service $2,000,000 Project

University of Texas Medical Center

Houston, TX
Flood Damage * Scope, Cost, Scheduling and Monitoring $25,000,000 Project

Mercy Hospital

Miami, FL
Hurricane Damage * Scope, Cost and Scheduling $1,500,000

Saginaw Valley Hospital

Saginaw, MI
Flood Damage * Restoration $1,500,000 Project

Matilda Dodge House

Rochester, MI
Fire Damage * Restoration $750,000 Project
Chris Gleason's picture
Chris began his Burton Brother career as a field laborer, learning exactly what it takes to restore properties from the ground up. Developing those construction "on the job" training skills helped him gain a more thorough...

Featured Projects

New York, New York
September 11, 2001 changed everyone's life. Burton Brothers is proud to have provided professional assistance in the assessment of damage of the Millennium Hotel, Merrill Lynch and Dow Jones Buildings. Burton Brothers also served as the lead consultant for properties controlled by the New York Port Authority.
Royal Oak, Michigan
2009 Water Damage * Water damage from second floor shower resulted in replacement of bathroom tile, shower pan and drywall in the kitchen below. "Everything is looking great. Burton Brothers has been really responsive and helpful during the whole way. Thanks for looking out for me. Cheers, M. Livanos"
Galveston, TX
Hurricane Damage on this condominium in Galveston Texas brought water and wind damage. Burton Brothers on the job cost analysis and estimating allowed workers to begin repairs before mold infestation occurred, which is so important in preventing further damage and keeping costs down. $26,000,000 Project